Section 19 Long Tunnel Crossings Integrated Pipeline Project

Section 19 Long Tunnel Crossings Integrated Pipeline Project Location Tarrant and Anderson Counties, TX Owner Tarrant Regional Water District Value $222 million The project is an integrated water delivery transmission system in the Dallas area consisting of 150 miles of pipeline, three new lake pump stations, and three new booster pump stations delivering a required…

B2P – Day 13 – The Bridge Is Open!

B2P – Day 13 – The Bridge Is Open! Posted on Posted on February 22, 2020 After the teams hard work the bridge is finally complete and the team packs up ready to attend the Sanzara bridge opening ceremony. The day consisted of team shots, song and dance, some very very long speeches from local…

Annacis Water Supply Tunnel

Annacis Water Supply Tunnel Location Vancouver, BC Owner Greater Vancouver Water District (Metro Vancouver) Value $288 million Metro Vancouver selected the Traylor-Aecon General Partnership, a consortium of Traylor Infrastructure Canada, ULC and Aecon Infrastructure Inc., to construct the second of five new water supply tunnel crossings in the region built to withstand a major earthquake…

B2P – Day 11 – The final fence!

B2P – Day 11 – The final fence! Posted on Posted on February 20, 2020 Weather: 30 C ( 86 F), Clear skies, Sunny & Humid … another day in paradise. We are so close, with the rock fill done and the right-hand-side (right) slab poured the Sanzara bridge is largely complete! Jenny led the…

Portal North Bridge

Portal North Bridge Location Kearny, NJ Owner New Jersey Transit Value $1.56 billion As part of a joint venture, Traylor was selected to complete the New Jersey Transit’s Portal North Bridge project. The National Railroad Passenger Corporation (Amtrak) and the New Jersey Transit Corporation (NJ TRANSIT) have proposed to enhance the capacity and improve the…

B2P – Day 10 – Rock Fill

B2P – Day 10 – Rock Fill Posted on Posted on February 19, 2020 Weather: 30 C ( 86 F), Clear skies, Sunny & Humid … again. With the fencing on the bridge complete we had the final task of back filling and installing the cement slab on the right-hand-side foundation trench. Fred lead the…

RiverRenew Tunnel System Project

RiverRenew Tunnel System Project Location Alexandria, VA Owner Alexandria Renew Enterprises Value $454 million As lead partner of the Traylor – Shea Joint Venture and in partnership with lead designer Jacobs and subcontractor Corman Kokosing, Traylor has been selected to design and build the RiverRenew Tunnel System Project for Alexandria Renew Enterprises in Alexandria, VA.…

B2P – Day 9 – Bridge Fencing Complete

B2P – Day 9 – Bridge Fencing Complete Posted on Posted on February 18, 2020 Jenny lead the operation today to complete the bridge fencing. Work entails folding the fence down and tying it to itself. This task is fairly labor intensive, chain link fence was clearly never designed to be folded down onto itself.…