Second Narrows Water Supply Tunnel

Second Narrows Water Supply Tunnel Location North Vancouver, BC Owner Greater Vancouver Water District (Metro Vancouver) Value $203 million The Second Narrows Water Supply Tunnel project will replace three existing water mains that were installed in 1948, 1954, and 1978. The 1.1-kilometer tunnel will cross under the Burrard inlet from north Vancouver to the City…

B2P – Day 2 – On Site at Last!

B2P – Day 2 – On Site at Last! Posted on Posted on February 10, 2020 The team started the day with breakfast at 6:30 am. The menu included boiled eggs and bread with peanut butter and jam. After breakfast we drove to site, which took around 30 minutes. It was fascinating to see everyone…

Sam Houston Tollway Ship Channel Bridge

Sam Houston Tollway Ship Channel Bridge Location Houston, TX Owner Harris County Toll Road Authority Value $859 million Traylor is the sponsoring partner of Ship Channel Constructors LLC (SCC), a joint venture of Traylor and Zachry Construction Corporation working on the Sam Houston Tollway Ship Channel Bridge Replacement project outside of Houston, Texas. The team…

Regional Connector Transit Project

Regional Connector Transit Project Location Los Angeles, CA Owner Los Angeles County Metropolitan Transportation Authority Value $1.2 billion The Regional Connector Transit extends from the Metro Gold Line Little Tokyo/Arts District Station to the 7th Street/Metro Center Station in downtown Los Angeles, connecting passengers from Blue, Expo, and Gold lines. This project creates the second…

B2P – Day 0 – Travel Day

B2P – Day 0 – Travel Day We’ve all officially made it to Kampala! Its 5 am and I am unable to get back to sleep so i’ll provide a quick update here! All of our team except for Jennifer, Sarah, and Fred had our connecting flights transfer thru Dubai. Becky and I had a…

Westside Purple Line Subway Extension, Section I

Westside Purple Line Subway Extension, Section I Location Los Angeles, CA Owner Los Angeles County Metropolitan Transportation Authority Value $1.9 billion As part of a joint venture, Traylor is constructing the $1.9 billion design-build of the Westside Subway Extension, Section 1, in Los Angeles. This is the first of three projects to extend the Purple…

B2P – PreTrip – Vaccines, Pull Planning, and Accomodations

B2P – PreTrip – Vaccines, Pull Planning, and Accomodations Posted on Posted on January 15, 2020 Vaccines, Vaccines, Vaccines!! As a precautional measure members of our team engaged medical professionals and the advice available on the CDC website to determine what travel vaccinations would be required/recommended. the following was recommended and/or required Measles-mumps-rubella ( MMR)…

Purple Line Light Rail Transit Project

Purple Line Light Rail Transit Project Location Bethesda, MD Owner Maryland Department of Transportation Value $2 billion The Purple Line project is a 16-mile light rail line that will extend from Bethesda in Montgomery County to New Carrollton in Prince George’s County. It will connect to four branches of the Metro rail system at Bethesda,…

Bridges To Prosperity – 2022

Bridges To Prosperity 2022 Posted on Posted on October 1, 2022 Day 1 The construction team has landed! The Traylor builders finally made it in last night (Friday 9/30) with the rest of the team coming together tonight to complete the group. We are spending our first nights in Kigali, a city of more than…