Who We Are

THREE GENERATIONS OF EXCELLENCE Since its inception in 1946, Traylor Bros., Inc. has developed into a highly adaptable construction organization with a proven capability to tackle the most difficult bridge, underground, and marine projects. Organized in 1946 in the State of Indiana, the company is thriving under the leadership of the third generation of Traylors,…

IH 45 Galveston Causeway Bridge Replacement

IH 45 Galveston Causeway Bridge Replacement Location Galveston, TX Owner Texas Department of Transportation Value $170 million The project entailed the construction of twin 8,592-foot, six-lane bridges (four traveling lanes and two full-width shoulder lanes) over the Intercoastal Canal between the Texas mainland and Galveston Island. Each bridge consists of a three-span cast-in-place twin cell…

Precast Facility, Stockton, CA

PRECAST FACILITY STOCKTON, CA TBI’s Stockton facility has produced more than 55,000 tunnel segments to date (more than eight miles of tunnel liner) and supports projects such as the Upper Northwest Interceptor Tunnel in Sacramento, CA and the Bay Tunnel in San Francisco, CA. The facility has more than eight total acres of storage and…

US 90 Biloxi Bay Bridge Replacement

US 90 Biloxi Bay Bridge Replacement Location Biloxi, MS Owner Mississippi Department of Transportation Value $350 million Hurricane Katrina destroyed the existing 1.6-mile US 90 Bridge across Biloxi Bay. The project consisted of the design and construction of a new high-rise six-lane bridge on a nearly parallel alignment with a bicycle/pedestrian shared-use path; new six-lane…

I-10, Main Span Bridges over Lake Pontchartrain

I-10, Main Span Bridges over Lake Pontchartrain Location Slidell, LA Owner Louisiana Department of Transportation and Development Value $170 million In August of 2005, Hurricane Katrina made landfall just a few miles to the east of Interstate 10 (I-10) over Lake Pontchartrain. The existing I-10 twin spans suffered severe damages and had to be temporarily…

Huey P. Long Bridge Approaches and Bridge Deck Widening

Huey P. Long Bridge Approaches and Bridge Deck Widening Location Jefferson, LA Owner Louisiana Department of Transportation and Development Value $440 million The Huey P. Long Bridge Widening was a four-phase project vital to the recovery of Greater New Orleans. The widening added an additional travel lane, as well as inside and outside shoulders to…

Huey P. Long Bridge Main Span Superstructure

Huey P. Long Bridge Main Span Superstructure Location Jefferson, LA Owner Value $450 million The Huey P. Long Bridge Widening was a four-phase project vital to the recovery of Greater New Orleans. The widening added an additional travel lane, as well as inside and outside shoulders to each side of the bridge, providing a safer…

Safe and Sound Bridge Improvement – Design/Build 554 Bridges

Safe and Sound Bridge Improvement – Design/Build 554 Bridges Location Statewide, MO Owner Missouri Department of Transportation Value $504 million The Safe and Sound Bridge Improvement Program, the largest bridge improvement project in Missouri history, repaired and replaced 802 of Missouri’s most structurally challenged bridges over four years. Approximately 1,100 bridges were either Condition 3…

Metro Red Line

Metro Red Line Location Los Angeles, CA Owner Los Angeles County Metropolitan Transportation Authority Value $157 million The Metro Red Line was a new line (part of Segment 3) connecting downtown Los Angeles to North Hollywood. The project entailed construction of the lines section in soft ground, mixed face, and rock, and included boring and…

Stan Musial Veterans Memorial Bridge

Stan Musial Veterans Memorial Bridge Location St. Louis, MO Owner Missouri Department of Transportation Value $230 million The first bridge built connecting downtown St. Louis and southwestern Illinois in more than 40 years, the completely new alignment relieved the Poplar Street Bridge (PSB), which is one of only two bridges in the U.S. to carry…