Blog post for 18-02-20 Weather: 30 C ( 86 F), Clear skies, Sunny & Humid ... again. With the fencing on the bridge complete we had the final task of back filling and installing the cement slab on the right-hand-side foundation trench. Fred lead the team in the back filling operation and Vinay lead the…

B2P- Day 4 – Harness Time

After eating our typical breakfast ( boiled eggs, PB&J on bread and Pineapple) our convoy headed out to site with the optimistic goal of having the fence prepped and all 120 swings attached to the bridge, which we achieved. We are using the term swings to describe the hanger, nailer and c-channel assembly that will…

B2P – PreTrip – Vaccines, Pull Planning, and Accomodations

Vaccines, Vaccines, Vaccines!! As a precautional measure members of our team engaged medical professionals and the advice available on the CDC website to determine what travel vaccinations would be required/recommended. the following was recommended and/or required Measles-mumps-rubella ( MMR) Hepatitis A Hepatitis B Malaria Pills Typhoid Yellow Fever Cholera Meningitis Rabies Tetanus Polio Flu I've…