#4 Shaft Hoist Replacement

Burke, ID.   •   $9 Million value  

The client plans to reopen the lower portion of the mine above the 2000 Level. To achieve this, it plans to rebuild or replace the existing shaft system, which has not been in service since 1983. Traylor Mining, LLC provided a scoping study with refurbishing options for the production hoisting system.