Louisiana Highway LA1 Relocation (Phase 1B and Phase 1C) ( tbi0601 & tbi0603) Leeville, Louisiana Construction of a 4-mile long high-level bridge with connecting ramps and interchanges.
through 04/2010
Louisiana Highway LA1 Relocation- Phase 1B Leeville, Louisiana Construction of a 4-mile long high-level bridge with connecting ramps and interchanges. Work consists of 16", 24", & 30" prestressed concrete pile foundation, cast-in-place substructure, type lll and BT-78 prestressed concrete girder, precast deck panels and cast-in-place concrete deck.
LA1 Over Bayou Lafourche at Leeville,Phase 1C - Main Span Leeville, Louisiana
Description - 0.165 mile main span structure over Bayou Lafourche. Work consists of 30" prestressed concrete pile foundation, cast-in-place substructure, welded steel plate girder, and cast-in-place concrete deck.
Project Gallery:
Phase 1B
Construction Method: Precast Concrete Girder
Contract No: 829-32-0007
Start Date: Notice of Award 01/26/06; Notice to Proceed 03/01/06
Completion Date: 3/22/2010
Owner: Lousiana Department of Transportation and Development
Joint Venture: Traylor/Massman
Phase 1C - Construction Complete Construction Method: Steel Plate Girder
Contract No: 829-32-0008 Start Date: Notice of Award 04/05/06; Notice to Proceed 01/29/07 Completion: 2/4/09 Owner: Louisiana Department of Transportation and Development
Joint Venture: Traylor/Massman