Maritime
LPV 145 T Wall Construction PDF Print E-mail

Chalmette Loop Levee Improvements, LPV 145 (tbi09-08)
St. Bernard Parish, LA
Chalmette Levee Constructors (comprised of Kiewit, Massman, and Traylor) was awarded this levee system project, which is an essential component of the New Orleans Hurricane Storm Damage Risk Reduction System (HSDRRS). 

 
GIWW (Gulf Intracoastal Waterway West Closure Complex) PDF Print E-mail
GIWW West Closure Complex (tbi0904)
Gulf Intracoastal Constructors, a Joint Venture between Kiewit and Traylor Bros., Inc., is providing preconstruction services and optional construction services to construct the Gulf Intracoastal Waterway West Closure Complex.
 
Cannelton Hydroelectric Cofferdam PDF Print E-mail

Read more...Cannelton Hydroelectric Cofferdam(tbi0902)
Hawesville, KY
This project is located on the south side of the Ohio River adjacent to Cannelton Locks and Dam, about 25 miles northeast of Owensboro, KY.  The existing USACE Cannelton Locks and Dam are located at Ohio River Mile 720.7.  Kiewit/Traylor Constructors (KTC) has been contracted by AMP Ohio to construct the cofferdam and perform the powerhouse excavation.  The cofferdam construction and excavation are being performed to allow for the construction of an 82MW hydro-electric power plant. 

 

 

 
Inner Harbor Navigation Canal PDF Print E-mail

Inner Harbor Navigation Canal (tbi0901)
Traylor-Massman-Weeks, LLC, as a subcontractor to Shaw Environmental & Infrastructure, was awarded the floodwall portion to a line of defense that is intended to provide improved hurricane protection for New Orleans, and specifically for the Inner Harbor Navigation Canal, from surges and waves at the 100-year level that may enter the canal from Lake Borgne.  The project also includes a temporary bypass, gate two navigable gate structures, and tie in walls to the existing levees. 

 

 
Chief Joseph Dam Gas Abatement Spillway PDF Print E-mail

Read more...Chief Joseph Dam Gas Abatement Spillway (tbi0505)
Bridgeport, Washington
In Douglas County, Washington, this project will include construction of concrete flow deflectors on each of the 19 spillways at Chief Joseph Dam.

 

 

 
McAlpine Lock Replacement PDF Print E-mail

Read more...McAlpine Lock Replacement (tbi0208)
Louisville, KY
TGM Constructors (Traylor/Granite/Massman) received letter of award dated September 24, 2002, for Lock Construction, McAlpine Lock Replacement Project, Louisville, Kentucky.

 

 

 
Rocky Reach Juvenile Fish Bypass PDF Print E-mail

Read more...Rocky Reach Juvenile Fish Bypass (tbi0205)
Wenatchee, WA
Removal of an underwater prototype structural steel fish surface collector and bypass system.

 

 

 

 

 
Pier 400 PDF Print E-mail

Read more...Pier 400 (tbi0004)
Los Angeles, California
Pier 400 Wharf project for the Port of Los Angeles consisted of a new 4,000 foot long dock, by 120 foot wide to be operated by 100 foot gage container unloading cranes.

 

 
Braddock New Gated Dam PDF Print E-mail

Read more...Braddock New Gated Dam on Monongahela River (tbi9902)
Allegheny County, Pennsylvania
Innovative 'in the wet' construction began the summer of 2000 on the New Braddock Gated Dam project located approximately 11 miles south of Pittsburgh.

 

 

 
Dam/Port Project History PDF Print E-mail

Read more...Dam/Port Project History
A complete history of maritime projects that Traylor Bros., Inc. has undertaken or been involved in.