Queens Bored Tunnels and Structures PDF Print E-mail

Queens Bored Tunnels and Structures (tbi0906)
The joint venture team comprised of Granite/Traylor/Frontier-Kemper was awarded this contract by MTA Capital Construction (MTACC) to build the Queens Bored Tunnels and Structures for Long Island Rail Road's East Side Access project in New York. 

 
University Link U220 PDF Print E-mail
University Link U220 (tbi0903)
University Link Light Rail, Contract U220 involves establishment of a tunneling site at the University of Washington Husky Stadium Parking lot in order to mine a light rail tunnel from the UW station to the Capitol Hill station.
 
South Cobb Tunnel PDF Print E-mail

Read more...South Cobb Tunnel Project (tbi0801)
Cobb County, Georgia 
The 27'4" hard rock South Cobb Tunnel is being mined 29,000 lf with a main beam TBM.

 

 

 
San Vicente Pipeline Tunnel PDF Print E-mail

Read more...San Vicente to Second Aqueduct Pipeline Project (tbi0501)
San Diego, California
The San Vicente Pipeline Tunnel is an 11-mile water conveyance built for the San Diego County Water Authority. 

 

 
LAMTA C0800 Metro Gold Line PDF Print E-mail

Read more...LAMTA C0800 Metro Gold Line, Eastside Extension Project (tbi0402)
Los Angeles, California
Construction of twin subway tunnels, 7500 lf long, excavated with two new 21 ft EPB tunnel machines in alluvial geology.

 
Upper Northwest Interceptor Sections 1 & 2 PDF Print E-mail
Read more...Traylor-Shea Joint Venture is constructing the Upper Northwest Interceptor Sections 1 & 2 project in Sacramento, California. UNWI 1 & 2 includes 19,240 feet of 144" pipe using EPB tunneling methods. The project also includes 54 feet of 120" interceptor pipeline, 20 access manholes, 2 transition structures, and the connection of three existing trunk sewer lines. 
 
Big Walnut Creek PDF Print E-mail

Read more...Big Walnut Creek Augmentation/Rickenbacker Interceptor (tbi0306)
Franklin County, OH
Construction of the 225' long cast-in-place box tunnel was completed August 2004. The TBM and all batching plants were all delivered, assembled, and commissioned in October 2004.

 
TBI Precast - Joint Venture Projects PDF Print E-mail

Read more...TBI Precast - Joint Venture Projects

In 2001 Traylor Bros., Inc. established the precast segment unit within the Underground Division.  Our goal is to be the preferred precast concrete tunnel liner manufacturer in the United States. 

 
Brightwater Conveyance System PDF Print E-mail

Read more...Brightwater Conveyance System - East Contract (tbi0602)
Seattle, Washington
When on-line in 2010, Brightwater will be the third regional wastewater treatment plant in a system serving King, Snohomish, and Pierce counties since the 1960s.

 
Underground Project History PDF Print E-mail

Read more...A complete history of current and completed Underground Projects is provided.